MILAN
De Gasperi Footbridge
Architectural design:
Arup
Structural design
Arup (Executive Plan, Structure) with MZA (Steel-deck and connection design)
Description:
Steel tubular system spanning 60 metres with arch-beam mechanical response and connections entirely welded in the workshop
Period of construction:
2008-2010