DUBLIN
Aviva Stadium
Architectural design:
Populous & STW Architects
Structural design:
Buro Happold (Steel-roof system), Cimolai Engineering Department (Method Statement), MZA (Suspended roof gantry systems and platforms)
Description:
Roof gantry system for inspection, maintenance and stadium camera services. The gantries and platforms cover a range of approximately 600 metres. The system was constructed to follow the double curvature of the stadium roof
Period of construction:
2008-2010